Wednesday, April 8, 2009

Wharf

April 8: Last night I continued with the planking. I used all the materials that I had. This was my second night installing the planking on the deck. I've covered one foot out of the six that I need to cover. I figured out a system that it is quicker. Hopefully with this system I can finish this portion in four days.

I started this idea for this layout tthe 29th of March 2009. I started to rip off the old layout the 30th. By the 1st of April I had the homasote installed on the table top and by the 3rd of April I had the standard and the narrow gauge tracks laid on the wharf.

No comments:

Post a Comment